Construction Proposal Evaluation

Contract: AMCMS Fire Sprinkler Main Piping Replacement

Item Evaluated Standard Automatic Fire International Fire Simplex Grinnell

1.0 Price: $36,000.00 x 1/$ _________ x 82 = 82 76.26 43.46

(Lowest Price) (Proposers Price) (Maximum Points)

2.0 Schedule: Does schedule comply with requirements?

(Yes-2) (No-0 or disqualify) = 2 2 2

3.0 Proposed Quality: Does proposal meet requirements?

(Yes-1-10) (No-0 or disqualify) = 10 10 10

4.0 Reference Checks: Were reference checks acceptable?

(Yes-2) (No-0 or disqualify) = 2 2 2

5.0 Previous Performance: Did Contractor perform

Satisfactorily in previous contracts?

(Yes-2) (No-0 or disqualify) = 2 2 2

6.0 Safety: Does Contractor have a satisfactory safety?

Program and experience working in occupied

Total Points by Contractor: (Sum of above - 100 Max.) 100 94.25 61.46 ________________________________________________________________________________________________________________________________

Recommended Contractor: Standard Automatic Fire Basis of selection - most points which provide best value to district

EVALUATORS:

George Mc Lean Date: 04-28-03

Mark Pantel Date: 04-28-03

Return to May Board Agenda